The implementation of a L.I.I.D. project is held in two phases:
Preparatory phase
- Preliminary study and definition of needs. During
this phase, a list of contacts and players is made, as well as of
issues encountered, current practices, and of the various solutions
already implemented.
- Interviews : Interviews are run in relevant
divisions and teams in order to record the experiences of the different
players on the mentioned issues.
- Technical audits : Several technical audits
are run in order to assess the ability of the repository to meet
the needs or to make a recommendation for the best possible solution.
The audits also enable to assess possible ways of collecting missing
information from various data sources.
- Definition of dashboards: The required measures
are identified, classified, and analyzed. The collection method
is documented. The different aggregation levels are defined by compiling
the measures. This phase is the most critical for L.I.I.D.: only
an extensive experience of the issues and technology encountered
combined with an in-depth knowledge of re-documentation solutions
for information systems enable designing such dashboards. The specification
document presents the corresponding scale models.
- Adaptations : Depending on the contents of the
dashboards, the specifications of the various adaptations to the
implemented solutions will be worked out.
- Distribution : Development of the mode and format
of distribution. Distribution modes are: mail, file, paper, etc.
Formats are varied: XLS, PDF, HTML, etc. The periodicity by which
decision making elements are refreshed is fixed. The publication
on the company's Intranet is also accounted for.
- Technical architecture : A technical architecture
is put forward after accounting for the legacy system, the adaptations,
modes and formats of distribution, volumes, profit management, and
confidentiality of the dashboards.
Implementation phase :
- Implementation of the repository. Necessary
adaptations and parameter definitions for the design and production
of the dashboards.
- Implementation of collectors
- Implementation of the indicators and dashboards.
Unit tests.
- Installation of target structure , profile and
confidentiality aspects in a test environment.
- Implementation of automatic refreshing mechanisms according
to the objectives decided upon during the preliminary phase.
- Technical and functional validation in a test
environment.
- Implementation of the production environment.
- Technical and functional validation in a production
environment.